Production release checklist
Before production, the project must have a clear written scope and an approved latest production drawing. The client or authorized partner should confirm the cabinet dimensions, layout, door direction, materials, colours, edge banding, visible finishes, hardware, add-ons and delivery boundary.
LOBIN also verifies that the required payment has cleared and that the latest production drawing has been hand-signed and uploaded as a PDF where the quotation requires it. The order starts only after LOBIN issues the production release.
This confirmation stage is the Design Lock. It prevents older drawings or informal chat revisions from being treated as the production instruction. Customer-supplied dimensions remain the customer responsibility unless expressly verified by LOBIN.