Materials & Design
Cabinet materials and construction
Understand carcass boards, door finishes, edge banding and the details that affect durability.
Read guide
Published supply reference prices from RM 320/m². Clear 10% · 50% · 40% payment policy, 15–16 days ex-factory production and worldwide shipping.
Production base address
LOBIN coordinates quoting, drawings, production checks and export preparation through its cabinetry production base in Qingyuan, Guangdong.
The base price book and add-on rules are public. Final quotations reflect the confirmed scope, market, service boundary and buyer programme.
10% starts design, 50% starts production after design approval and the remaining 40% is paid before dispatch.
Every panel is QR-scanned against the ERP pick list before packing to reduce missing-part risk. Verified shortages are handled under the signed quotation.
Warranty coverage follows the written standard for the selected cabinet structure, door panel and hardware series.
LCL or FCL to Malaysia, the US, Canada, Australia / New Zealand, Thailand, Vietnam, Singapore and the Gulf.
The final specification is confirmed by project. These are the decisions we organize before production.
Project specifications define carcass, back panel, shelves, legs or plinth, and fixing method before production.
Edge banding and finish direction are reviewed against the selected panel and visible-edge requirements.
Soft-close hardware is scheduled by cabinet; functional storage and premium hardware remain selectable upgrades.
Lighting, glass, wall panels and special structures are coordinated as project-specific options.
Cabinet knowledge
Plain-language guides to materials, pricing, production and delivery—connected directly to the decisions in your estimate.
Materials & Design
Understand carcass boards, door finishes, edge banding and the details that affect durability.
Read guideCost & Pricing
Learn the difference between running-length, elevation-area and option-based pricing before you estimate.
Read guideProcess & Delivery
See what is confirmed before production, how cabinets are checked and how export packing is planned.
Read guideSend measurements, drawings or photos. The 10% milestone starts design and technical drawing work.
Confirm drawings, materials and hardware. The additional 50% production deposit starts manufacturing.
After production and QC review, the remaining 40% balance is due before dispatch.
After the balance is paid, cabinets are dispatched with packing records and project handover documents.



Production steps and cabinet labels create traceable parts for each room and cabinet.
Every panel is QR-scanned and matched against the ERP pick list before packing.
Door alignment, drawer operation, hardware, cabinet codes and packing handover are checked.
After verification, cabinets are packed assembled or disassembled according to the agreed method.
People Behind Every Project
Clear ownership matters across borders. Meet the people responsible for turning your scope into drawings, production decisions and a controlled handover.
Chief Executive Officer
United States · Canada · Australia
Robin is the Chief Executive Officer of LOBIN. He leads the company’s international strategy and the development of its factory-to-project cabinetry delivery system. Working across design, manufacturing, quality control, logistics, and overseas project coordination, he focuses on reducing uncertainty throughout the custom cabinetry process. His role is t…
Southeast Asia Site Operations Manager
Malaysia · Southeast Asia
Jiancong manages LOBIN’s on-site operations across Southeast Asia. He coordinates site conditions, delivery arrangements, installation progress, and communication between customers, contractors, installers, and the LOBIN production team. His role is to identify and resolve site-related issues efficiently, helping each cabinetry project move from delivery…
Craftsmanship & Production Supervisor
Global Projects · Factory Production · Overseas Project Support
Zhiming oversees craftsmanship standards and production quality at LOBIN. He works closely with the design and manufacturing teams to review technical details, verify cabinet structures, and ensure every project is produced in accordance with the approved specifications. From material processing and edge banding to pre-assembly inspection and packing read…
Chief Designer
United States · Canada · Australia
Peeta Ho is the Chief Designer at LOBIN. He leads the design direction of custom kitchens, wardrobes, and whole-home cabinetry projects, translating client requirements, architectural conditions, and material preferences into clear and buildable solutions. Working closely with clients, project teams, and factory specialists, Peeta oversees each project f…
One public reference price book, with final quotations matched to the confirmed scope, market, service boundary and buyer programme.
Use the published price book as a reference, send measurements and proceed through the four written payment stages. Ideal when you already have a local installer.
Send drawings and room lists. Firm supply pricing, cabinet coding and packing handover for your site team.
Full-container and repeat orders receive dedicated freight planning, production scheduling and a project-specific supply quotation.
Send the product type, approximate size, material direction and destination. LOBIN will review the scope and prepare the appropriate quotation path.