How to Order

Four steps from
measurement to shipment.

Start from the public price book, send the information you have and confirm the written scope. The payment policy follows real project milestones from design through production and dispatch.

The Process

Four confirmed steps. No surprises.

Every step has a published price, a defined input and a defined output.

01

Choose & Measure

You provide
  • Product type and approximate size
  • Measurements, drawings or photos
  • Material tier from the price list
We do
  • Scope check against published pricing rules
  • Add-on and freight direction
  • Project-specific quotation review
You receive
  • Planning quote with tier and add-ons priced
02

Design & Payment Confirmation

You provide
  • 10% design deposit to start design
  • Design approval, then 50% production deposit
We do
  • Technical drawings and production-spec confirmation
  • Material and hardware schedule
You receive
  • Design lock and confirmed production schedule
03

Production · 15–16 Days

You provide
  • Nothing — production runs to the confirmed drawings
We do
  • ERP panel scan & parts verification
  • Human QC: doors, drawers, hardware, codes
  • Export-ready packing
You receive
  • QC photo records and packing list
04

Pay 40%, Dispatch & Handover

You provide
  • 40% balance after QC and before dispatch
  • Freight: LCL or FCL (forwarder contacts provided)
  • Receiving and local site coordination by your local team
We do
  • Shipment and export documentation
  • Delivery handover to your destination
You receive
  • Cabinets at your door or port — your local trades install
What You Receive

Paperwork that protects your order.

Every order ships with records your installer and your accountant can both use.

Quotation & PI

Firm quote with tier, add-ons and freight written in.

Material & hardware sheet

Board, edge banding, hardware schedule per room.

QC photo records

Pre-assembly checks: alignment, drawer operation, hardware fit.

Packing list

Cabinet codes and room labels for your installer.

Shipping documents

Export paperwork for your broker or freight forwarder.

Shipping & Delivery

Three ways to get your cabinets.

Freight is quoted with your order — never hidden in the cabinet price.

LCL (Shared Container)

Single rooms and small orders. Pay for your share of a container, not a whole one.

FCL (Full Container)

Whole homes and batch orders. Best cost per cabinet at volume.

Freight Coordination

We connect you with freight forwarders; you arrange shipping. Export documents provided; duties and taxes are yours.

Common Questions

Before you order.

The three questions everyone asks about the direct-supply model.

What if I don’t have drawings?

Send measurements and photos. After the project scope is reviewed, the 10% design deposit starts measured layouts and production drawing work; it is part of the total quotation.

Do you install the cabinets?

Installation is excluded from the standard cabinet price. Your local trades can install from our cabinet codes, packing list and QC records. Suitable Malaysia or Thailand projects may request a local dealer connection for installation support.

How long until my cabinets arrive?

Production takes 15–16 days ex-factory. Shipping adds time depending on your destination and freight method — we confirm the estimate with your quote.

Your measurements. Our coordinated production workflow. 15–16 days.

Cabinets from RM 320/m². 10% to start design · 50% after design approval to start production · 40% balance before dispatch.

WhatsAppGet Price