We sell cabinets.
Not a service story.
Most cabinet prices include design, project management and installation overhead — whether you use those services or not. We don't bundle any of it. That's the whole reason the price stays low.
Everything that ships with the tier price.
The square-metre price is a complete cabinet price — not a bare carcass that needs a pile of mandatory extras.
Cabinet bodies, doors and internal panels
Confirmed carcass, doors, shelves and panels — 18mm construction, four-side PUR edge banding.
Standard soft-close hardware
Soft-close hinges and runners included in the tier price. Blum and premium fittings are published add-ons.
Design tied to the first milestone
The 10% design deposit starts measured layouts, cabinet schedules and production-ready drawings and forms part of the total quotation.
ERP-managed parts check
Every panel is QR-scanned and verified against the ERP pick list before packing to reduce missing-part risk.
Export-ready packing
Packing engineered for ocean and long-haul transit, with cabinet codes and packing lists.
15–16 days production
From drawing confirmation to factory dispatch. Shipping time depends on your freight method and destination.
The services we deliberately don't sell.
This is not a limitation — it's the pricing model. These are exactly the items other suppliers bundle into your per-metre price.
LOBIN supplies cabinets; buyers arrange qualified local trades. For suitable Malaysia or Thailand projects, LOBIN may connect the buyer with a local dealer for installation support.
We supply cabinetry. Stone tops and appliances are confirmed separately where applicable.
Freight is arranged separately — LCL or FCL — and we connect you with freight forwarders.
Three reasons, no secrets.
None of them involve cutting corners on materials.
Direct supply model
LOBIN coordinates your cabinet order through its Qingyuan production base, with third-party freight and local services listed separately.
No hidden service bundle
Design, freight and local services are identified as separate scope items or milestones instead of being hidden in the cabinet reference price.
Published reference rules
Tiers and add-on rules are public. Final quotations reflect confirmed specifications, market, service boundary and buyer programme.
The 10% design deposit starts the drawing work and forms part of the total quotation.
- Measured layout review from your room dimensions or photos
- Cabinet schedule with quantities and codes
- Production-ready drawings your installer can build from
- Begins after the 10% design deposit, which forms part of the total quotation
The design deposit is credited within the agreed project total rather than added on top. It starts the measured layouts, cabinet schedules and production-drawing stage.
Check the price book yourself.
Published tiers and add-on rules — converted at the reference rate of 2026-08-28. Final project pricing is confirmed from the selected specifications, market and written service boundary.