DA-C01-L02 · 01 · Project Workflow Foundations · Module 01 · Project brief and evidence

Collect measurements and define the project brief

Bring customer priorities, room measurements, appliance details and site constraints into one brief, with missing information and measurement responsibilities clearly recorded before the next review.

Approx. 14 min readFoundationPublic lesson

Your output

A room-by-room project brief with an evidence list and open items.

Best for

Dealers, designers and site coordinators preparing project information.

Learning record

Sign in to save progress

Completion records personal progress only. It is not project approval, dealer authorization or production release.

Video lesson

Lecture video slot · Collect measurements and define the project brief

The video for this lesson is in production. The written lesson and available tools remain ready below.

Video in production

Build one usable project brief

A useful brief connects the customer's priorities with the site conditions that affect the cabinets. Collect room-by-room measurements, photographs, appliance information and service locations. Label anything provisional, confirm who must verify critical dimensions and keep the current drawing separate from earlier versions. The brief should support review, not hide uncertainty.


Build one reliable project brief

Do not let important information remain scattered across chat messages, voice notes and unnamed photos. Create one project brief for each opportunity and update it when the customer confirms a change.

Customer and project identity

Record:

  • Customer or company name and primary contact
  • Country, city and complete project location when available
  • Customer role: homeowner, dealer, designer, contractor or project buyer
  • Project name and room list
  • Target decision, renovation and delivery timing
  • Preferred language, currency and measurement system

Use a consistent project name in the estimator, folders and later quotation documents.

Site information

For every room, request overall wall dimensions, ceiling height, door and window positions, columns, beams, skirting, plumbing, drainage, electrical points, gas points and appliance services that affect the cabinets.

Ask for wide-angle photos of every relevant wall plus close-up photos of obstacles and service points. A floor plan, elevation, hand sketch or designer drawing is helpful, but it does not replace verification of critical finished dimensions.

Customer-supplied dimensions remain the customer responsibility unless LOBIN expressly confirms a different written measurement scope.

Cabinet scope

List cabinet runs by room and type. Separate base, wall, tall and island sections because they follow different pricing rules. Note finished width, height, depth and quantity for each run.

Record requirements for countertops, sinks, appliances, lighting, glass doors, drawer systems, handles, pull-out baskets, hidden doors, wall panels and any other special item. A missing add-on can turn a useful estimate into an avoidable customer dispute.

Material and appearance direction

Ask for the preferred cabinet body, door material, colour, visible grain direction, edge-banding choice, handle style and hardware level. If the customer is undecided, record two or three acceptable directions rather than writing only premium or good quality.

Use the material tier lesson and current catalogue library to explain available combinations.

Delivery and site responsibility

Confirm who will manage freight, customs, duties, destination handling, unloading, storage, local delivery and installation. Record access constraints such as condominium booking rules, lift size, stair access, working hours and storage limitations.

These items are not automatically part of the cabinet factory price.

File discipline

Name files so another team member can understand them without opening every attachment. A useful pattern is:

Project-Room-View-Date-Version

Examples include Miller-Kitchen-WallA-20260907-V1.jpg and Miller-Kitchen-Elevation-20260907-V2.pdf.

Keep the latest confirmed drawing separate from old versions. Never delete the revision trail after a decision has been made.

Before creating the estimate

Check that you can answer four questions: What is being supplied? How is it measured? Which material direction applies? Which costs remain outside the factory scope?

When those answers are clear, continue to presenting cabinet materials as customer value.

Brief communication note

Keep the next step clear, proportionate and actionable.

For the dealer

I need complete information, but I worry that too many questions will tire the customer or expose that I do not know the answer yet.

For the client

I may know how I want the room to feel, but not the technical language. I want the dealer to understand me without making the process feel like homework.

  • 1Open with why the project matters now and what success would feel like
  • 2Ask for the problem behind each requested feature
  • 3Explore the outcome the customer most wants to avoid
  • 4Summarize in the customer own priorities and ask for correction
  • 5Explain why each photo, dimension or appliance model is needed

Apply the lesson

Practice task

Prepare one room-by-room project brief. Attach or reference the available measurements, photos and appliance details, then list every unverified item and its review owner.

Stage-exit standard

Move forward when this is true.

Move on when the current brief identifies rooms, priorities, scope, decision participants, evidence references, unverified dimensions and who must confirm them.

Next action

Read the checklist guidance
WhatsAppGet Price